Answer: 4-8 hours Explanation: a standard pattern would make this very simple and with carefull planning it can be done quickly |
thorns construction services llc |
Answer: One full day Explanation: But that depends on the type of grout and adhesive you use for the tile. |
Jack of trades services |
Answer: One full day Explanation: Assuming the surface is ready for tile, the tile can be installed in one day. A second short day is also required to grout and seal as needed. |
Rafael Tile Works |
|
ProMatcher |
Answer: 8-12 hours Explanation: One full day because the toilet has to come up the tile needs to be laid down then you have to go back the next day to grout it and install the toilet. After the grout dries you have to wipe the haze and seal the joints if your grout needs it |
Rod's Home Improvements |
Answer: Two full days Explanation: Depending on existing flooring, if covered with tile removal with roto hammer, clean up floor to accept new Hardie backer, tile it. let it set, grout, clean up, |
DLR Construction and Investment LLC |
Answer: One full day Explanation: Depending on the preparation |
M&D Home Improvement |
|
ProMatcher |
Answer: Two full days Explanation: The process involves several steps, including preparing the subfloor, possibly installing a cement backerboard, laying the tiles, allowing the adhesive to set, and then grouting the tiles. The time required can vary based on factors like the complexity of the pattern, the condition of the existing floor, and the installer’s experience. Generally, for a room of this size, it’s reasonable to expect the installation to take at least one full day, often extending into two days. |
DS Contracting |
Answer: 8-12 hours Explanation: Barring all unforseen situations arriving, being just the tile labor without including tear out, repair, prep, backer board, removing fixtures, replacing fixtures, trim and such, its feasible to assume the time could be paid in a 8 hour day and upon curing of the thinset, grouted the following day in half a days time. |
brown remodeling and construction |
Answer: 4-8 hours Explanation: Depending on slab condition and layout |
Smith's services |
|
ProMatcher |
Answer: One full day Explanation: Remove and replace the floor with new tile and leveling the floor. Drying time take the longest !! |
American Eagle Construction |
Answer: Two full days Explanation: One day for installing and second day for grout. |
Splash of colors painting |
Answer: One full day Explanation: It would take couple hours to install tile. Then would have to wait 24 hours for grouting process. So one day total instal time from begining to completed |
Brock's handyman |
|
ProMatcher |
Answer: One full day Explanation: I would say a day . Once you set up and the cuts etc and clean up! |
Jackson's Paints & Interiors |
Answer: One full day Explanation: In order for it to be done right you don't rush thru a job take your time and make it look professional |
Southern Handyman Services & More |
Answer: 2-4 hours Explanation: for me some guys take two days |
TAC Tile |
|
ProMatcher |
Answer: 4-8 hours Explanation: 81 square ft. Of tile is not a lot of tile. When you take into consideration that most tile used is 18"x18". That is 1.5 sq. Ft. each tile. If you can lay 1.5 sq. ft. Every 2 min that is so in 1 hr that is 30 pieces of 18"x18" tile per hour and that is 45 sq. ft. a hour 90 sq. Ft. Every 2 hours and you only had to lay 81 sq
ft
. I would also allow 2- 3 hrs extra for going back and forth for special cuts.
|
Bronco Restoration and Construction LLC |
Answer: 4-8 hours Explanation: It really all depends on the set up the type of tile but usually we can get the tile down 48 hours and come back the next day and throughout it and let it set and there you are brand new bathroom floor |
MRG Painting & Projects |
Answer: 4-8 hours Explanation: With tear out and installation of Hardi backer. It should take 4-8 hrs. Usually leveling is involved with older homes. |
Bath Makeover Pro LLC |
|
ProMatcher |
Answer: 8-12 hours Explanation: It takes 3 or 4 hours to put down the tile I usually come back the next day and grout |
J and r contracting |
Answer: 4-8 hours Explanation: Well given that the underlayment is in good condition and is solid. Also, given that any old tile that may be being replaced does not require significant effort to remove, 4 to 8 hours would be an appropriate amount of time. Furthermore, we have found in many cases that the underlayment is not significant enough to protect from cracking especially in cases where there is significant weight. There are a lot of factors that can go into laying a new tile floor. However in a perfect situation 4-8 hours would be reasonable. |
Price is Right Painting and Remodeling |
Answer: One full day Explanation: Depends on layout and size of tile. |
M.G Tile & Marble Inc. |
|
ProMatcher |
Answer: Two full days Explanation: The glue needs 24 hours to dry. Then the next day it will need to be grouted and sealed. |
Bacallao Flooring |
Answer: Two full days Explanation: glue needs 24 to set before you can grout between tiles. so you will need 2 full days to complete the job. |
snssolutions |
Answer: 8-12 hours Explanation: 6-8 hours to set tile let stand overnight then grout tile and clean |
Hands With A Mission |
|
ProMatcher |
Answer: Two full days Explanation: One day for the tile, the next for the grout. |
Misija construction |
Answer: 4-8 hours Explanation: All will depend on the amount of fixtures that are in the way and what needs to be uninstalled to facilitate a new floor |
iDesign Interiors, LLC |
Answer: 8-12 hours Explanation: The flooring has to be leveled and smooth before tile can be laied and it is time consuming. |
G&J Carpentery Services |
|
ProMatcher |
Answer: 8-12 hours Explanation: The first day to install the tiles, and let them set over night. The next day to grout the floor, and finish the job. |
Pegasus Construction Group, Inc. |
Answer: 8-12 hours Explanation: Basic labor to install ceramic floor tile with favorable site conditions. Layout tile pattern. Fabricate and install with thinset mortar. Grout and clean surface. Includes planning, equipment and material acquisition, area preparation and protection, setup and cleanup. |
Arcadian Handyman |
Answer: One full day Explanation: Typically needs a revisit the next day for grouting and sealing. |
Pinchot Home Improvement LLC |
|
ProMatcher |
Answer: Two full days Explanation: You have to install the backer board. Then you have to Install the Mortar Then the tile. And you have to wait Until the mortar dries before you can grout it. So that takes two days |
JRT Construction |
Answer: 8-12 hours Explanation: Basically one day maybe another four hours because you have extra prep or subfloor to put down toilets to pull or vanities to replace so it all varies just for tile 8 hours come back and grout it in the morning |
Foster Construction |
Answer: 2-4 hours Explanation: Half fau gor small bath |
Texmaxx Construction L.L.C. |
|
ProMatcher |
Answer: 8-12 hours Explanation: It takes three days because you have to wait for the tile to set, then grout and seal the tile. |
Relux Construction LLC |
Answer: 4-8 hours Explanation: It depends on cuts and the type of sub-floor |
GetGreatFlooring.com |
Answer: 4-8 hours Explanation: After installing let dry good before walking or moving heavy furniture on it. |
Saul Reyes Contracting. |
|
ProMatcher |
Answer: Not sure Explanation: I am a Professional Plumber, Only |
Peace of Mind Plumbing LLC |
Answer: 8-12 hours Explanation: Lay tile, then grout next day |
Midwest construction |
Answer: 8-12 hours Explanation: Take little more time let dry tinsel and then we can apply ground to make a perfect job. |
Professinal Plumbing & Handyman |
|
ProMatcher |
Answer: 4-8 hours Explanation: 81 sq ft should take about depends on Substrates. |
Floors 2 UR Doors |
Answer: Three full days Explanation: first day prep-work (hardie backer) and start laying tile. Second day finish installation. third day install grout and drying process . |
Russ Construction & Remodeling LLC |
Answer: 2-4 hours Explanation: Pretty basic . unless there are boarders and inlays |
1964 |
|
ProMatcher |
Answer: 2-4 hours Explanation: Takes 2 hours. |
Designing Home Inc. |
Answer: 4-8 hours Explanation: We are professional tile layers with years of experience. We lay tile on a daily basis. |
Seacrest Renovations |
Answer: 4-8 hours Explanation: It can take anywhere from 3 to 7 hours to lay a typical ceramic tile floor, I chose 4-8 hours because while being time efficient it is never our policy to rush. |
BSH Home Design |
|
ProMatcher |
Answer: 4-8 hours Explanation: The best is to set the tiles one day, let the mortar sit overnight and then grout the next day. |
Ironman Home Restoration |
Answer: 4-8 hours Explanation: Standing up on the work needs to be done, job can take a little bit longer of subfloor needs to be installed! If not Needed floor can be installed within 2 hours. |
Colorful Homes Painting And Restoration |
Answer: 2-4 hours Explanation: If the tiles are large than it can be done quickly. If they are small to tiny than it can take forever. |
Kitchen Remodeling Chicago |
|
ProMatcher |
Answer: 4-8 hours Explanation: Depending on how much tile cutting is involved, this shouldn't take long, particularly if there are no fixtures installed yet. If the tile has to be cut around the fixtures, it will take a little longer. |
Essence of You Designs |
Answer: Two full days Explanation: We do all the prepping and installation on day one. Then we can grout the day after. All cuts can be done during installation since the floor is small enough. |
Contractor Plus inc. |
Answer: 4-8 hours Explanation: Depending on the pattern and design. |
DC Construction Services Inc. |
|
ProMatcher |
Answer: Two full days Explanation: It depends, does the question assume that that all the fixture are already moved. Also it depends on the thin-set used and cure times. |
Cedar Ridge Remodeling Company |
Answer: Two full days Explanation: The question leaves a lot of scenarios to the professional answering this question, we would remove existing vanities and cabinets, toilet demo existing floor-make any necessary subfloor corrections or repairs, lay tile underlayment then lay tile, grout tile, clean up then reinstall or install new vanity with top and fixture, toilet etc... |
Nu-Face of PA |
Answer: 4-8 hours Explanation: This is after the Durarock is secured. |
Chris Benedict's All Trades Service |
|
ProMatcher |
Answer: Three full days Explanation: This depends on so many things. Is the floor prepped? Are the different tiles different thicknesses? What exactly is a standard pattern? |
Russell Tile |
Answer: One full day Explanation: Using quick set thin-set. A floor this size can be laid down and grouted in one day. |
Freedom Handyman Services, Inc. |
Answer: Two full days Explanation: It really depends on the pattern chosen and the cuts required. Once the floor is prepped and laid out, it takes very little time to actually set the tiles in place. Then you have to wait until they set (24 hours) before you can grout them and trim out the rest of the floor. |
Handyman Matters North Houston |
|
ProMatcher |
Answer: One full day Explanation: Dampness, humidity, un-even floors, in-experienced tile-setter - all of these things will affect the installation completion time. Any tile floor of any size should sit for 24 hours before floor traffic. |
RP Cutcher General Contractor LLC |
Answer: 2-4 hours Explanation: With a standard pattern it should only take a couple of hours to lay the tile but you have to come back the following day to grout! |
A Diamond Affair Interiors |